Owner’s engineering · Sorting and recycling plants

Owner’s Engineering: your technical counterpart to the contractor

The contractor knows their plant. As owner’s engineer, we make sure the plant that gets built is the plant you contracted for – from the tender documents through execution documentation to the acceptance test.

Updated: 19 October 2026

In short: Owner’s engineering is technical support for the owner in dealing with the plant contractor. We review documents, guaranteed values and interfaces and keep the technical argument in writing.

Where plant projects typically run into trouble

The same patterns keep recurring in the tender and execution of sorting and recycling plants:

Hybrid specification

The specification demands a functional performance and at the same time fixes component dimensions in the annexes. Usually only one of the two levels gets reviewed.

Asymmetric guaranteed values

Guaranteed values are weighted equally but backed by very different penalty rates.

The gap nobody owns

Earthing, lightning protection or zone consistency between the explosion protection document and the equipment lists fall between the contract scopes, and nobody is named as responsible.

Our service modules

The four modules can be commissioned individually or as a continuous mandate.

A. Tender and bid review

Before award, we check the tender for contradictions, prepare a colour-coded completeness matrix and an open-points list, and check the plausibility of the guaranteed values.

B. Review of execution documentation

We issue a written opinion per document, typically within five working days, keep a register of open points and document our recommendations.

C. Acceptance and verification of guaranteed values

The test methodology is agreed in writing in advance. Throughput, yield and purity are verified according to a sampling plan, with at least two sampling series per value. The result is an acceptance test report.

D. Interface and gap review

We reconcile the contract scopes, compare explosion protection with the equipment lists, review zones and instrumentation and control as well as earthing and lightning protection until responsibility is named, and consider CE conformity and the interface to the authority.

What you receive

  • Completeness matrix and open-points list
  • Written opinion per reviewed document
  • Gap list with named responsible parties
  • Agreed test methodology for the guaranteed values
  • Acceptance test report

Who we work for

Operators, municipalities, investors and public contracting authorities who procure, build or accept sorting or recycling plants in Europe or in the Gulf Cooperation Council (GCC) region.

Why Experts4Recycling

Experts4Recycling is an engineering office with more than 20 years of experience in plant engineering, on both the supplier and the operator side. We work exclusively for the owner. We put our findings in writing, with sources, so you can substantiate your technical argument towards the contractor. With plant engineering and project management we can extend the review to the entire project execution if needed.

Frequently asked questions

When should I involve an owner's engineer?
Most effectively before award, when the tender and bids are reviewed. The modules can also be commissioned individually later, for example for the execution documentation or the acceptance.
Do you work for the contractor or for the owner?
Exclusively for the owner.
How quickly will I receive an opinion on documents?
The opinion per document is typically issued within five working days.
How are guaranteed values verified?
The test methodology is agreed in writing in advance. Throughput, yield and purity are verified according to a sampling plan with at least two sampling series per value.

A technical assessment on your side

Describe your project briefly and we will get back to you within 24 hours. The first call is no-obligation.