Plant Engineering for Recycling and Sorting Facilities

Experts4Recycling develops plant concepts for new builds, extensions and retrofits. We combine an understanding of material streams, machinery and conveying technology, plant logistics, safety and the investment framework into a solid basis for permitting, tendering and implementation.

Reviewed by our experts · Last updated: 16 November 2026

In short: Plant engineering translates quantities, material properties, quality targets and site conditions into a technically implementable process. The result is not just a layout, but a coordinated concept made up of a mass balance, machine functions, material paths, interfaces and a cost framework.

When is plant engineering worthwhile?

Plant engineering is especially valuable when several technical solutions or suppliers are possible, when an existing plant is to be expanded, or when a solid investment framework is needed first. The engineering work defines the operator’s requirements before individual manufacturers’ quotes dictate the technical solution.

For existing plants, we additionally examine whether capacity, product quality or availability can be improved through targeted modifications. A retrofit can be more economical than a complete new build, but must fit the existing layout, control system, permit situation and CE concept.

From input material to process flow diagram

The starting point is the input quantities, composition, variability and desired output qualities. From this we develop process steps, the split of material streams and the mass balance. The process flow diagram shows how screening, shredding, sensor-based sorting, air separation, metal separation, baling and other units work together.

The mass balance makes capacities, recirculation, losses and output quantities traceable. It thereby forms an essential basis for machine sizing, storage sizing, energy and utility requirements, and economic calculations.

2D/3D layout and plant logistics

In the layout, machinery, conveying technology, steel structures, operating and maintenance areas as well as storage and traffic areas are brought together spatially. In addition to short material paths, we take into account accessibility, escape and rescue routes, assembly areas, crane and forklift movements, and possible expansion stages.

3D models help identify heights, transfer points and spatial conflicts early on. However, they do not replace the detailed design of the individual specialist trades; rather, they create a coordinated planning basis and defined interfaces.

CAPEX and project basis

Based on the chosen level of concept development, we prepare an investment cost estimate for machinery, conveying technology, steel structures, EICA (electrical, instrumentation, control and automation), assembly and — where agreed — construction and infrastructure. Accuracy and informative value depend on the available level of planning detail. Assumptions, price basis, contingencies and excluded scope are therefore documented transparently.

How we engineer your plant

  1. Define the planning basis: record input, output targets, capacity, operating hours, location and existing assets.
  2. Develop the process: evaluate process variants and prepare the flow diagram and mass balance.
  3. Pre-size the technology: define machine functions, performance data, utilities and key interfaces.
  4. Plan the layout: develop the 2D/3D arrangement, material paths, storage, logistics and maintenance access.
  5. Frame costs and schedule: present the CAPEX framework, project phases and key risks.
  6. Prepare subsequent phases: hand over the basis for permitting, funding, tendering and project implementation.

Your result

  • a traceable process concept with a flow diagram and mass balance,
  • a coordinated plant layout with defined material and traffic routes,
  • technical requirements and interfaces for further planning,
  • a transparent investment framework based on the agreed level of planning detail,
  • a solid basis for permitting, funding and tendering.

Practice from our projects

Our engineering experience ranges from retrofit and bottleneck analyses to the general engineering of large sorting and processing plants. Projects handled include plant concepts with an annual throughput of around 200,000 and 280,000 tonnes, as well as complex lightweight packaging, residual waste, refuse-derived fuel and plastics recycling processes.

Your contact

DI Thomas Baldt

Founder and Managing Director · Industrial engineer (TU Graz)

More than 20 years of experience in the design, conversion and realisation of recycling and sorting facilities.

Frequently asked questions about plant engineering

What documents are needed to start the engineering work?
Helpful inputs include material data, quantities, quality targets, as-built drawings, site information, operating hours and any known boundary conditions. Missing information can be gathered step by step as the project progresses.
What is the difference between a feasibility study and plant engineering?
The feasibility study compares variants and clarifies under which conditions a project can be implemented sensibly. Plant engineering then makes the chosen variant concrete, technically and spatially.
Why is a mass balance needed?
It shows how input quantities are distributed across intermediate and output streams. This allows capacities, recirculation, storage needs and economic assumptions to be sized in a traceable way.
How accurate is a CAPEX estimate?
Accuracy depends on the level of planning detail and the quality of the input data. That is why the reference date, assumptions, ranges and excluded costs are stated transparently.
Can an existing plant be optimised?
Yes. For retrofit projects, we analyse bottlenecks, quality, availability, layout and interfaces, and develop graduated conversion options.
Is the engineering tied to specific manufacturers?
No. Specific makes are only fixed once this becomes technically necessary or relevant for a later award of contract.

New build, expansion or retrofit?

A structured preliminary review helps you identify early which technical variant fits your quantities, quality targets and site conditions.